Megger Report docs

Searching:
doc
Megger Testing of Busses, MCCs, and Distribution Panels ...

Page 11 of 15. Subject: Megger Testing of Busses, MCCs, and Distribution Panels. Revision Number and Date: R 0 1/17/2011. Procedure No.: LUM-FFA-MNT-0016

http://gwenholladay.weebly.com/uploads/5/0/6/9/5069966/lum-ffa-mnt-0016__megger_testing_of_busses_mccs_and_distribution_panels__draft.docx

Date added: August 18, 2016 - Views: 1

doc
Test Reports Template - HHS

This <Project Name> Test Report provides a summary of the results of test performed as outlined within this document. 2.0 Test Summary

https://www.hhs.gov/ocio/eplc/EPLC%20Archive%20Documents/46-Test%20Reports/eplc_test_reports_template.doc

Date added: December 23, 2016 - Views: 6

doc
26 08 30 (16972) - Electrical Starting and Testing by ...

Section 26 08 20 - Electrical Starting and Testing by Contractor. ... Note data on test report form..2 Megger test all insulators to ground.

http://www.infrastructure.alberta.ca/Content/docType486/Production/26_08_30B.doc

Date added: August 19, 2016 - Views: 6

doc
Megger Testing of Transformers Effective TBD - Gwen Holladay

LUM-FFA-MNT-0020 Megger Testing of Transformers R0Page 19 of 20. Page ... Do not take megger readings while the ... Report discrepancies or unsatisfactory results to ...

http://gwenholladay.weebly.com/uploads/5/0/6/9/5069966/lum-ffa-mnt-0020__megger_testing_of_transformers__draft.docx

Date added: August 19, 2016 - Views: 1

doc
Medium Voltage Power System Maintenance - Alberta

Record data on test report form..2 Megger test insulators to ground..3 Megger test bussing phase to ground, ... Medium Voltage Power System Maintenance ...

http://www.infrastructure.alberta.ca/Content/docType486/Production/26_13_90_PMS.doc

Date added: August 18, 2016 - Views: 10

doc
SECTION 16123 - palmbeachschools.org

Megger report shall at a minimum include the following for the Commissioning Agent. Test date. Manufacture and model number of test equipment.

https://www.palmbeachschools.org/buildingdeptment/wp-content/uploads/sites/14/2016/01/260513ElectricalWireandCable.docx

Date added: January 10, 2017 - Views: 1

doc
assets.tequipment.net

Megger’s MIT420 Insulation Resistance and Continuity Tester has been the instrument of choice of Lou Iaconelli. ... Transfer this data to the customer report.

http://assets.tequipment.net/assets/1/26/Documents/Megger/MIT430_EN/mit430_en_doc_5.doc

Date added: September 8, 2016 - Views: 2

doc
AC 150/5340-26B, Maintenance of Airport Visual Aid Facilities ...

This Advisory Circular (AC) provides guidance for the recommended minimum maintenance practices to be used in the maintenance of airport visual aid facilities.

http://www.faa.gov/documentLibrary/media/Advisory_Circular/150_5340_26b.doc

Date added: August 18, 2016 - Views: 9

doc
piyushpanchal2007.mynetworksolutions.com

-Cable megger report (primary prior to pulling)-Cable megger report (secondary after pulling)-Pressure test record(TR)-MC check record (remote loop)(green color)

http://piyushpanchal2007.mynetworksolutions.com/images/Inst._Insp._and_Qua._Con..doc

Date added: August 26, 2016 - Views: 1

doc
PACIFIC GULF MARINE, INC. - Department of Transportation

A survey report attesting to the suitability of the above shall be submitted to the PGM ... Open and disconnect motor leads and megger. Report results to the Port ...

https://voa.marad.dot.gov/docs/Library/ship_manager/docs/Group%2016/DEACT%20SPEC%20PGM%20TACS.DOC

Date added: August 19, 2016 - Views: 2

doc
MSFC Problem Reporting and Corrective Action (PRACA) System

MSFC Record # A08086 In-Flight Anomaly Number -- Contractor Report Number E-009 JSC# -- KSC# -- Problem Title CONNECTOR PINS FAILED MEGGER EICN# -- ELEMENT ET ...

https://foia.msfc.nasa.gov/sites/foia.msfc.nasa.gov/files/FOIA%20Docs/75/A08086.doc

Date added: March 25, 2017 - Views: 1

doc
PART 1 GENERAL - GE Industrial

Inspect and report concealed damage to carrier within ... Megger and record readings for phase to phase, phase to ground. Individual lengths should be at least ...

http://apps.geindustrial.com/publibrary/checkout/1995%20CSI%20Master%20Format|16467|generic

Date added: August 18, 2016 - Views: 3

doc
Electrical Systems Prefunctional Checklists and Start-Ups

The report shall contain infrared photos of trouble spots ... MD Anderson Cancer Center electrical systems prefunctional checklists and start-ups 26 08 13 ...

http://www2.mdanderson.org/depts/cpm/standards/specs/div26/26%2008%2013.doc

Date added: August 18, 2016 - Views: 21

doc
SURVEY REPORT ON SOLAS GMDSS - ubsho.com

SURVEY REPORT ON SOLAS GMDSS. RADIO TECHNICIAN’S SURVEY. ... .For NIS ships, transmitting results to be tested with MEGGER:_____ MEGOHM (>50 MOHM dry, ...

http://ubsho.com/download/OMCS/Report/CRC-01.doc

Date added: January 31, 2017 - Views: 1

doc
ITD 2698 (Rev

ITD 2698 (Rev. 6-04) Loop Detector Test Report. ... Loop Lead-In Number: D61 Megger (MΩ) Inductance. µH D62 Loop System Ea_ 100 M to ( 125 - 1000 (H ...

http://apps.itd.idaho.gov/Apps/FormFinder2DMZ/Home/OpenLink?formnumber=2698

Date added: December 7, 2016 - Views: 1

doc
SECTION 16123 - palmbeachschools.org

Submit all Engineer approved megger test to the Building ... The Building Department requires a copy of the approved report before they authorize the utility company ...

https://www.palmbeachschools.org/buildingdeptment/wp-content/uploads/sites/14/2016/01/16123-260513ElectricalWireandCable.doc

Date added: January 3, 2017 - Views: 1

doc
1 - University of Manitoba

Report any discrepancies to the Consultant BEFORE tender close. ... Megger circuits, feeders and equipment up to 350V with a 500V instrument.

https://umanitoba.ca/campus/physical_plant/media/ae/16050_Basic_Elec_Mat_and_Methods.doc

Date added: August 22, 2016 - Views: 1

doc
secure1.mhhs.org

SECTION 26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS. PART 1 - GENERAL. 1.01 WORK INCLUDED. A. Comply with the provisions of Sections 260500. B. Provide a ...

https://secure1.mhhs.org/engineering_bestpractices/Master_Specs/Electrical/26%2005%2019%20Low%20Voltage%20Electrical%20Power%20Conductors.doc

Date added: August 23, 2016 - Views: 1

doc
Radio Technicians Survey slr/gmdss - ABS

Associated REPORT NO. DATE RADIO TECHNICIANS SURVEY. ... For NIS ships, transmitting results to be tested with MEGGER: MEGOHM (>50 MOHM dry, >5 humid) 7.

http://www.eagle.org/eagleExternalPortalWEB/ShowProperty/BEA%20Repository/MyEagle/ClassificationForms/RadioTechnicianForms/GMDSS

Date added: August 20, 2016 - Views: 9

doc
COMET phase IV procedure - Department of Transportation

Megger test applicable galley equipment (See General Note H). B. Ensure electric power to range, oven, ... Record findings in the Phase IV Maintenance Report/s.

https://voa.marad.dot.gov/docs/Library/ship_manager/docs/Group%2015/COMP4ROS.DOC

Date added: August 20, 2016 - Views: 3

doc
HQ 112378 - U.S. Customs and Border Protection

HQ 112378 November 30, 1992 VES-13-18-CO:R:IT:C ... Megger Test of Electric Motor ... ABS report MS 8250-G indicates otherwise; ...

http://rulings.cbp.gov/hq/1992/112378.doc

Date added: August 27, 2016 - Views: 1

doc
TESTING PROCEDURES - uky.edu

Megger all cables and record the readings before and after the ... Measure temperature and humidity before the Hi Pot Test and include these reading on the Test Report.

http://www.uky.edu/cpmd/sites/www.uky.edu.cpmd/files/standards/260800S01_voltage_testing.doc

Date added: March 25, 2017 - Views: 1

doc
POWER MAINTENANCE ROUTINES AND FORMS

The Storage Battery report (RG47-0001) should have been filled out by the installation vendor. 6. ... Ensure proper grounding of the site using a megger. 2.

http://www.centurylink.com/techpub/77350/TP77350IssMChptr14_820_840SeriesForms.doc

Date added: August 18, 2016 - Views: 10

doc
REGULAR MEETING – MOTLEY CITY COUNCIL

Employee Leave Report. ... Barros talked about a “megger” that will send a high voltage through the windings of the motor and it will tell if there is a short ...

http://www.cityofmotley.com/vertical/sites/%7B72EE7511-647E-4EE1-B547-F867A5FD103C%7D/uploads/%7B027A81C2-376D-4AAB-9E60-169E8724319F%7D.DOC

Date added: December 7, 2016 - Views: 1

doc
Commissioning Sequence Progress Check Sheet

Report Submitted and Approved (cable megger; Grounding) _____ _____ O & M Manual (Final) Submitted _____ _____ Training Scheduled and Completed ...

http://www.umaec.umich.edu/wp-content/uploads/2013/10/Electrical-Power-Sys.doc

Date added: August 26, 2016 - Views: 1

doc
Westinghouse Proprietary Class 2 - Rensselaer at Hartford

Because no subsequent reading was given in the report, it is assumed that the low megger reading might be an indication of potential sheath degradation.

http://www.ewp.rpi.edu/hartford/~denisd2/EP/Other/draftNov24/FinalDraftNov24am.doc

Date added: August 18, 2016 - Views: 1

doc
Radio Technicians Survey slr/gmdss - ww2.eagle.org

Associated REPORT NO. DATE RADIO TECHNICIANS SURVEY. ... For NIS ships, transmitting results to be tested with MEGGER: MEGOHM (>50 MOHM dry, >5 humid) 7.

http://ww2.eagle.org/content/dam/eagle/forms/GMDSS-TECH.doc

Date added: August 22, 2016 - Views: 3

doc
Outline of Final Report - ntl.bts.gov

Report Organization ... With a MEGGER meter, A test instrument for measuring the insulation resistance of conductors and other electrical equipment; ...

https://ntl.bts.gov/lib/25000/25000/25039/ITS_Operational_Support-Final_UTRC.doc

Date added: February 5, 2017 - Views: 1

doc
SURVEY REPORT ON SOLAS GMDSS - ubsho.com

GLOBAL MARINE BUREAU INC(GMB) SURVEY REPORT ON SOLAS GMDSS. RADIO TECHNICIAN’S SURVEY (This form must kept on board and be available for inspection

http://www.ubsho.com/download/GMB-SURVEY%20REPORT/SR-01.doc

Date added: August 20, 2016 - Views: 2

doc
GENERAL REQUIREMENTS AND QUALIFICATIONS - dod.hawaii.gov

Appendix C: Sample: Maintenance Report/Checklist (1 page) Appendix D: Sample: Operational Performance Tests (2 pages)

https://dod.hawaii.gov/hieng/files/2016/07/Scope-of-Work-HIARNG-PM-Oahu.docx

Date added: January 5, 2017 - Views: 1

doc
Performance of VCSELs for SCT links - University of Oxford

Performance of VCSELs for SCT links. ... In this note we report about measurements of electrical and ... The light output was measured with MEGGER OTP620 power meter ...

http://www-pnp.physics.ox.ac.uk/~weidberg/VCSEL_report_new.doc

Date added: August 18, 2016 - Views: 1

doc
Domestic Hot Water Heat Maintenance Tracing

The heater circuit shall be continuous and megger readings shall be at least 1000 megohm regardless of the heater ... submit separate report for each segment, ...

http://www2.mdanderson.org/depts/cpm/standards/specs/div22/22%2005%2033.doc

Date added: August 30, 2016 - Views: 1

doc
Tri-annual Testing of Electrical System

The contractor is to report to room D-70 to coordinate the work to be performed ... Megger phase-to-phase and phase-to-ground and measure contact resistance in micro ...

https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=576134&FileName=VA249-13-Q-0181-006.docx

Date added: January 5, 2017 - Views: 1